top of page
Search
  • info33623

Pilot Project Success!!


Foothills has recently set up operations in Europe, based out of Poland. We have just wrapped up our first pilot well and brought our continuing successes to the EU.

The coring was done in a copper bearing zone. We cored 152.3 Meters of friable anhydrite, gypsum and feldspar with 100% recovery. Coring was completed over 5 days using the Wireline Retrieable Coring sytstem, with XLI low invasion technology and the reusable steel Half Moon quick view inner tube.

The real success story was in the quality of the core recovered as you can see in the photos, the top was core taken by another company, the bottom taken in the same field, formation and depth by FRS.

Another Vendor (Upper Image)

Foothills Resource Services (Lower Image)

80 views0 comments

Recent Posts

See All
bottom of page